Categories
AFNewsNG Logo
National News Special Report

EXP0SED: NNPC reveaIs why FG shut down all refineries in Nigeria

Thompson Nsisongabasi

Sep 10, 2020

The Group Managing Director of the Nigerian National Petroleum Corporation, Mele Kyari, says the four oil refineries in the country have been shut down in Port Harcourt, Warri and Kaduna.

READ ALSO: Tinubu Breaks Silence on Hardship, Inflation, Power Crisis - Vows Nigeria Will Overcome Economic Storm

Kyari said this on Channels Television's Politics Today programme on Wednesday.

READ ALSO: I Will Not Allow Criminality As President, Peter Obi Declares

He explained that all four refineries were functioning below capacity and it had thus become necessary to stop them from operating all together.

READ ALSO: ABIA 2023: Enyinnaya Abaribe Dumps PDP, Reveals Next Line Of Action | DETAILS

Responding to a question, the NNPC boss said, "First, all the four refineries in three locations are shut down and it was a deliberate decision for two reasons. One is that delivery of crude oil to these refineries is completely challenged because the pipeline network has been completely compromised by vandals and all kinds of people that will not allow us to operate these pipelines.

READ ALSO: "Terrorists Have Outgunned Our Troops" - Ndume Raises Alarm Over Boko Haram War, Sends Urgent Message To Tinubu

https://afnews.ng/nnpc-never-paid-us-n5-35-billion-as-subsidy-oil-marketers/

READ ALSO: REVEALED: How All Progressives Congress (APC) Played Into The Opposition Hands Ahead Of 2027 - Sumner Sambo Warns

"That means you are not able to deliver crude oil to these refineries effectively to their maximum capacity. Secondly, what you call rehabilitation is different from the turn around maintenance. Turnaround is routine which every refinery does but when you talk about rehabilitation, it is that colossal loss of capacity in the refinery and it means you haven't done the turnaround maintenance properly.

READ ALSO: [TOP STORY] Ikoyi Collapse: Owner Of Building, Femi Osibona Discovered Dead

"Typically, every refinery is expected to operate at 90 per cent of its installed capacity. With the best of effort, with all the turnaround maintenance that has taken place, it is impossible to run any of the refineries before the shutdown at that level. Our estimate was to run it at 60 per cent of capacity but if you do that, all you are doing is value destruction. You will take $100 crude into the refinery and bring out $70 product. It doesn't make sense."

Related Stories

""

— Thompson Nsisongabasi

Join the Conversation

Signed in as Member